HANNOVER STREET

Gorge was appointed to build this impressive 7 storey building in the heart of Mayfair in London. The package comprised of 208 tonnes structural steelwork frame, and 1547 m2 of metal decking to the floors. The project was installed using an onsite tower crane and involved careful lift considerations, and logistics working within a congested tight city centre location.

Gorge are experts in multistorey steelwork construction in tight city centre locations.

LOCATION: Mayfair, London
TOTAL WEIGHT: 208 Tonnes
MARKET SECTOR: Offices
MAIN CONTRACTOR: Claritas Group
ENGINEER: WSP UK LTD