ERDINGTON LEISURE CENTER
Gorge Fabrications were appointed on a JCT contract to build the frame and floors of a brand new leisure centre. Gorge conducted the detailing, manufacturing and erection of the hot rolled structural steelwork package. The programme also consisted of cold roll purlins fittings, painting steelwork over the swimming pool, placement of pre-cast concrete blanks, metal decking and 2 precast stair cases over 4 flights of stairs.








